Buying guide
Clearances, desking systems, power, acoustics and the order to buy things in.
On this page
1. Measure the room, not the furniture
2. Count people, then count desks
3. Decide the desking system before the finishes
4. Plan power and data with the furniture, not after it
5. Take acoustics seriously in an open plan
6. Storage: less, and in the right place
7. Order in the right sequence
Furnishing one desk is shopping. Furnishing a floor is a project. The difference is that on a project the expensive mistakes happen before anything is ordered.
This is the sequence we would follow.
Get the floor plan, or draw one. Mark the fixed things: columns, radiators, risers, the door swing, where the power and data actually come out of the floor or wall.
Then work in the space furniture needs around it, which is the part people forget:
| Clearance | Allow |
|---|---|
| Behind a desk, for a chair to push back | 1000mm minimum, 1200mm if it is a walkway |
| Main circulation route | 1200mm |
| Between back-to-back desk runs | 1600mm total |
| In front of a filing cabinet or cupboard door | 900mm |
| Around a meeting table, per seat | 750mm of table edge, 900mm behind |
A layout that works on paper at 1000mm clearances and fails in the room is almost always a circulation problem, not a furniture problem.
Not the same number. Decide early:
A floor with enough desks and nowhere to take a call is a floor people avoid.
Desking comes in a few families and they do not mix well visually:
Pick the family first, then the finish. Trying to match a new cantilever range to an existing panel end range across a room rarely looks deliberate.
The commonest fit-out regret is furniture that arrived before anyone decided where the power was going. Sort out, on the plan:
Open plan without acoustic treatment is the reason people wear headphones all day. It is cheap to fix at fit-out and awkward afterwards.
A room with hard floors, glass and plasterboard needs more absorption than you think.
Most offices buy too many pedestals and not enough shared storage. A modern floor usually wants:
Made-to-order items, which includes most acoustic products, special colourways and design soft seating, run to 15 to 20 working days. Put those in first even though they arrive last.
Installation pricing assumes reasonable access. The things that turn a smooth day into a charged return visit are:
Tell us the awkward bits in advance. Nobody minds a difficult site. Everybody minds a surprise.
Something will be missing. Order five per cent more of the small consumable items, keep one spare chair, and do not book the office move for the day after the last delivery is due.